A drain works because the ground falls away from the building, and the work in this office begins wherever that fall has stopped.

Company no.
17428275
D‑U‑N‑S
235115338
Incorporated
30th August 2026
Office
ME9 9SX

SIC 42990 · Construction of other civil engineering projects n.e.c.

A clay pipe running away from the camera along the floor of a battered trench, bedded on pea shingle, with a spigot-and-socket collar in the foreground.
A run bedded on pea shingle. The collar in the foreground is a spigot-and-socket joint.

Walking the fall backwardsLowest cover first

A cast iron access cover lifted clear of its frame, light coming up out of the opening beneath it.
Cover off, frame still seated.
  1. Downstream cover first Chamber 01

    The lower cover, not the gully everyone points at: it shows whether the run already stands full.

  2. Gas test, then levels Both ends

    Gas-tested before anyone leans in; cover and invert levels at both ends, because they are the fall.

  3. In against the flow Upstream travel

    The camera climbs against the water, out of the cover already lifted.

  4. Code it where it is Clock reference

    Chainage is read off the cable as it pays out; each feature gets a clock reference, 12 the crown, 6 the invert.

  5. Stop where the camera stops Reported, not assumed

    Where the camera stops, the report stops: the length beyond goes down as unsurveyed, never as sound.

Grades 1–5Five ways a run stops carrying

A coded feature gets a grade, the grade decides which remedies are on the table, and the remedy decides who signs.

Grading used on reports from this office
Gr.What the water meets on the runDetail
1 Barrel round, joints closed, full bore to the next chamber.Structural 1 · service 1 Open
Evidence
Still per joint, nil return against chainage, levels both ends.
Remedy
None. The run is recorded and dated.
Signed
The surveyor. A nil return needs no counter-signature.

Close

2 Hairline crack, slightly open joint, or deposits under five per cent of bore.CR · OJM · DES Open
Evidence
Still square on, chainage burnt in, clock reference, deposit depth.
Remedy
Jet and re-survey the same visit, bore shown both ways.
Signed
Whoever commissioned it, or the agent holding the building.

Close

3 Multiple fractures, roots through a joint, deformation, or deposits to twenty per cent of bore.FC · RI · D Open
Evidence
Stills both ends of the length, deformation against bore, chainage of the root joint.
Remedy
Cut roots, patch the joint. Fracturing down most of a run is lined end to end.
Signed
The owner, and the insurer’s surveyor while a claim runs.

Close

4 Broken pipe, pieces displaced, invert missing, a hard obstruction, or running infiltration.B · OB · IN Open
Evidence
Last clear still, the chainage the crawl stopped at, water standing in both chambers.
Remedy
Jet and re-survey first: an obstruction that moves was a grade 2. What stays is cut out or lined.
Signed
The undertaker on a public run, the street authority by permit in the highway.

Close

5 Collapse. Bore lost, void over the crown, ground loss, settlement at the surface.X · void confirmed Open
Evidence
Footage from each reachable end, the unsurveyed length as a figure, the surface before lifting.
Remedy
Excavate and relay: flow over-pumped, the fall recovered, the void filled, the run tested.
Signed
The undertaker’s engineer, the street authority for the opening, the owner for levels.

Close

The same stoppage, two different digsGrade against job

The same code at the same grade is a two-hour patch under a driveway and a week of propping under a conservatory floor.

So the grading is written before the quotation: chainages, depth to invert, the surface above each defect.

A cutaway of an inspection chamber: benching sloped to a half-round channel with two branches entering.
Benching keeps the flow in the channel when the chamber is not full.

Where the fall goes slackFall and gradient

A run that silts up every winter is usually not dirty. It is slack, and it was slack on the day it was laid.

Solids drop out of water that has stopped moving, and the bore narrows from the invert up.

Fall and gradient checker

Maguire’s rule
Long section of a drain run between two chambers showing the length along the pipe and the fall between the two invert levels ground level fall length along the pipe upper lower
Measured on site

Enter a length and a fall.

Gradient
—
Reference gradient
—
Comparison
—

One in the bore in millimetres over 2.5; what a run is built to comes from its designer.

Rain that never reaches a sewerSurface water

Roof water is the other half of the fall.

Plenty of foul runs around Teynham carry roof water they were never sized for: a downpipe went into a gully that turned out to be foul.

Which gully is which A tracer at the head of the run, watched at the next chamber, settles it.

Taking the roof off that run means sending it elsewhere: a soakaway, a crate, or an agreed surface-water connection.

Order of preference Ground first, watercourse second, sewer last and only on written agreement.

Whether the ground drinks at all is measured, not assumed.

Percolation A pit to the soakaway’s depth, filled and timed three times, slowest used.

Where the roof water goes

One trench, one storm
Trial figures · 15 minute storm
Section through a soakaway trench one metre wide and one metre deep with the roof and downpipe feeding it, and arrows showing water soaking out of the base and the lower half of both sides roof downpipe ground level trench width 1.0 m base and sides soak stored water

Enter a roof area.

Inflow over the storm
—
Soaks away per metre run
—
Trench length needed
—
Storage to be held
—

One storm, one trench. A full sizing repeats it across durations.

Four answers to a run that has stoppedSIC 42990

  • Read CCTV survey

    A coded crawl against chainage, a still per feature, two grades. What a report carries.

  • Close Patch, line or dig

    Three remedies, and conditions on the run that take the choice away. Which a defect allows.

  • Lay Fall built in

    Set out upwards from the connection, bedded to a class, closed by test. Levels and bedding.

  • Join Sewer adoption

    Drawings, levels and calculations that have to agree. What goes in.

One engineer, a camera and a levelling staff. No crew, and no second visit to find the covers.

Survey requests go to the office email with a street address and the cover positions if known.

ExcavationReaching the pipe, and closing the ground again

An excavation open under a work lamp at dusk, a new length bedded in clean stone, a surveyor at the trench edge with a levelling staff.
Teynham at last light: the trench open, the new length bedded, the staff held on the invert.
Surface courseSaw-cut, squared
Binder courseJoint sealed to the cut
Sub-baseCompacted in layers
BackfillIn compacted layers
Granular surroundBedded and haunched
A reinstatement goes back in the layers it came out in, to the permit’s specification.

Reaching a slack or broken length is mostly excavation with a short piece of pipework in the middle. Utility drawings are pulled, the ground swept, trial holes dug by hand.

An opening in a public footway is a permitted street work carrying its own reinstatement specification, and one that fails inspection is dug up again at the opener's cost.

Soft ground is the same sequence in other materials, topsoil kept separate and put back last; how far the sides stand unsupported is the ground around Sittingbourne.

Run A, and the metre the water stopped at0–24 m

Chainage diagram of run A, manhole 01 to manhole 02 A straight 24 metre run drawn level. A survey camera pays out cable from manhole 01 and logs a fracture at 4.20 metres, roots at 9.60 metres and settled deposits at 14.10 metres, then halts at an obstruction at 18.40 metres. The 5.6 metres beyond the obstruction is surcharged and unsurveyed. 0 4 8 12 16 20 24 m surcharged · unsurveyed MH 01 MH 02 3 FC 4.20 m 3 RI 9.60 m 2 DES 14.10 m 4 OB 18.40 m crawl halted here
The crawl halts at the obstruction at 18.40 m. The 5.6 m above it stands surcharged: water that arrived and never left.

Ask the office to look at a runSite survey

What the office needs first is where the run is and what it is doing. Everything else is read on site from the covers.

The office replies with a date and the cover positions it needs. Nothing is passed on.

A village street at night after rain: one lit lamp, the wet carriageway holding its reflection, cottages receding into the dark, and a cast iron cover set into the near lane.

Nothing under a street is visibleuntil it stops working

Teynham after rain: one lamp, a wet carriageway, and a cover set in the near lane.